Self Manual
Last updated
Last updated
Before you can get started, the individual modules must be correctly and securely mounted. Then the commissioning process described below must also be carried out before configuration.
Press the Maintenance button
immediately when it turns white and keep pressed until it is blinking red. Release the LED button when it blinks red.
Note: The white light is only available directly after connecting it to power for approx. 2 seconds. After that moment you are no longer able to get into the maintenance mode unless power is dis- and reconnected again.
Then you can come back to the main flow.
Press 2
Software is downloaded in this step. The terminal reboots to install it.
It may be required to setup static IP on your terminal. Here are the alternative steps to take at step 8 of the main flow.
Press 2